<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:media="http://search.yahoo.com/mrss/"><channel><atom:link href="https://docs.mepaco.net/DesktopModules/LiveBlog/API/Syndication/GetRssFeeds?Category=audit&amp;mid=510&amp;PortalId=0&amp;tid=139&amp;ItemCount=20" rel="self" type="application/rss+xml" /><title>Mepaco Blog</title><description>Reliable by Design</description><link>https://docs.mepaco.net/news/blog</link><item><title>How to Determine if your Auger / Screw Conveyor is Failing</title><link>https://docs.mepaco.net/news/blog/how-to-determine-when-your-auger-screw-conveyor-is-failing?postid=1117</link><category>Audit,Field Services,Screw Conveyor</category><pubDate>Wed, 18 Aug 2021 13:34:59 GMT</pubDate><description>&lt;p&gt;&lt;img alt="" src="/Portals/0/Images/Blog/Misc/determine-auger-failing.jpg?ver=o0rrZmZX8wr--a1lWR8cGg%3d%3d" /&gt;&lt;/p&gt;

&lt;p style="margin-bottom:11px"&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:105%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;&lt;span style="font-size:12.0pt"&gt;&lt;span style="line-height:105%"&gt;If you have a transport, incline or &lt;a href="https://www.mepaco.net/news/blog/surge-loading-metering-screw-conveyors-are-key-component-in-247-formulation-line" target="_blank"&gt;metering screw&lt;/a&gt;, these conditions are symptoms of a failing auger / screw.&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;

&lt;ul&gt;
	&lt;li&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:105%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;&lt;span style="font-size:12.0pt"&gt;&lt;span style="line-height:105%"&gt;The screw is rubbing on the wall of the tub&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/li&gt;
	&lt;li&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:105%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;&lt;span style="font-size:12.0pt"&gt;&lt;span style="line-height:105%"&gt;There is a bow or wobble when running&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/li&gt;
	&lt;li&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:105%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;&lt;span style="font-size:12.0pt"&gt;&lt;span style="line-height:105%"&gt;The hanger bearings are wearing out prematurely&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/li&gt;
	&lt;li&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:105%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;&lt;span style="font-size:12.0pt"&gt;&lt;span style="line-height:105%"&gt;The wear pads are ground down beyond normal wear.&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/li&gt;
	&lt;li&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:105%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;&lt;span style="font-size:12.0pt"&gt;&lt;span style="line-height:105%"&gt;The gear box is hot.&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/li&gt;
	&lt;li style="margin-bottom:11px"&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:105%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;&lt;span style="font-size:12.0pt"&gt;&lt;span style="line-height:105%"&gt;The drive shaft is worn out prematurely.&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/li&gt;
&lt;/ul&gt;

&lt;p style="margin-bottom:11px"&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:105%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;&lt;span style="font-size:12.0pt"&gt;&lt;span style="line-height:105%"&gt;Screw conveyors are important to keep product moving between processes, so pay close attention to these systems to stay ahead of maintenance issues.  &lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;

&lt;p style="margin-bottom:11px"&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:105%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;&lt;span style="font-size:12.0pt"&gt;&lt;span style="line-height:105%"&gt;After any major incident, contact &lt;a href="https://www.mepaco.net/services" target="_blank"&gt;Mepaco Services&lt;/a&gt; to inspect repair. Mepaco Services may be able to make some repairs on site. Welding, straightening, stainless finishing can be performed on site.  However, re-machining a new piece, shaft or remanufacturing a paddle/ribbon, needs to be worked at the factory.  &lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;

&lt;p style="margin-bottom:11px"&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:105%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;&lt;span style="font-size:12.0pt"&gt;&lt;span style="line-height:105%"&gt;It is important to assess the life and stress of the augers to make sure that you do not experience down-time. Mepaco Services can provide&lt;a href="https://www.mepaco.net/news/blog/maintenance-audit-discovers-repairs-that-decrease-batch-time-by-2-minutes" target="_blank"&gt; audits&lt;/a&gt;, service contracts or emergency repair to help to prolong the life of screw conveyors.&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;
</description><guid isPermaLink="false">1117</guid></item><item><title>Case Story: What Can Happen When an Agitator Problem is Ignored?</title><link>https://docs.mepaco.net/news/blog/case-story-what-can-happen-when-an-agitator-problem-is-ignored?postid=1113</link><category>Audit,Field Services,food processing equipment,Mixer Blender,Parts</category><pubDate>Mon, 02 Aug 2021 15:48:43 GMT</pubDate><description>&lt;p&gt;&lt;img alt="" src="/Portals/0/Images/Blog/0821/Broken-Shaft.jpg?ver=o0rrZmZX8wr--a1lWR8cGg%3d%3d" /&gt;&lt;/p&gt;

&lt;p style="margin-bottom:11px"&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:107%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;&lt;b&gt;&lt;span style="font-size:14.0pt"&gt;&lt;span style="line-height:107%"&gt;&lt;/span&gt;&lt;/span&gt;&lt;/b&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:107%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;&lt;b&gt;&lt;span style="font-size:14.0pt"&gt;&lt;span style="line-height:107%"&gt;Case Story: What can happen when an agitator problem is ignored?&lt;/span&gt;&lt;/span&gt;&lt;/b&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;

&lt;p style="margin-bottom:11px"&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:107%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;A high-volume pet food processor utilized a Mixer/Cooker in their operations which produced 45-minute batches.  The application called for 28 RPM and mixing cold product at 35 – 45 degrees. During the process of loading different ingredients into the Mixer-Cooker, a Vmag buggy fell into the mixer, causing damage to the agitator.&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;

&lt;p style="margin-bottom:11px"&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:107%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;The processor made repairs to the bent shaft and paddles and was able to get the Mixer-Cooker back online into full production.  &lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;

&lt;p style="margin-bottom:11px"&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:107%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;Many processors assume that if the paddles do not rub the side of the tub, that the agitator has had a successful repair. But in many cases (and in this case), there was extensive damage and over time the shaft began to flex, causing the agitator to break. This failure completely stopped production.&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;

&lt;p style="margin-bottom:11px"&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:107%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;There are a few choices to stay ahead of agitator care:&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;

&lt;p style="margin-bottom:11px"&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:107%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;Preventative Maintenance:  Partner with Mepaco Services to inspect agitators to ensure the shaft is straight and look for stress and other damage.&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;

&lt;p style="margin-bottom:11px"&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:107%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;After Event Care: Processors may be able to fix the shift to continue production, but contract with Mepaco Services to inspect the shaft and straighten if necessary. &lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;

&lt;p style="margin-bottom:11px"&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:107%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;Most importantly, processors should avoid emergency maintenance, causing down-time and lost production.  &lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;

&lt;p style="margin-bottom:11px"&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:107%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;It is not uncommon to have dropped tools into Mixers, so prepare for the event if it does happen.  Consider an audit to assess the life of the agitator and consider ordering a replacement so you can have duplicity for uninterrupted down-time.  &lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;

&lt;p style="margin-bottom:11px"&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:107%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;Delivery of agitator replacements are 3 – 6 months out due to the availability of stainless material.  Mixers, Blenders and Grinders are the work horse of the processing system, so be sure that agitator care and component availability are part of the maintenance program.&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;

&lt;p style="margin-bottom:11px"&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:107%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;Mepaco Services offer on-site audits, training, and service contracts as well as emergency repair. &lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:107%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;span style="font-size:11pt"&gt;&lt;span style="line-height:107%"&gt;&lt;span style="font-family:Calibri,sans-serif"&gt;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;
</description><guid isPermaLink="false">1113</guid></item><item><title>Sanitation and Safety Checklist: Time for a Review?</title><link>https://docs.mepaco.net/news/blog/sanitation-and-safety-checklist-time-for-a-review?postid=1092</link><category>Audit,Equipment,food processing equipment,Food Safety</category><pubDate>Wed, 22 Jul 2020 15:40:03 GMT</pubDate><description>&lt;p&gt;&lt;img alt="" src="/Portals/0/Images/Blog/0720/Sanitation-CHecklist.jpg?ver=2020-07-22-081250-203" /&gt;An equipment safety and sanitation &lt;a href="https://www.mepaco.net/news/blog/maintenance-audit-discovers-repairs-that-decrease-batch-time-by-2-minutes" target="_blank"&gt;audit&lt;/a&gt; can provide direction for implementing improvement procedures and specifying equipment updates that mitigate risk and solve for safety and production goals.  Here’s an excerpt from our audit checklist:&lt;/p&gt;

&lt;ul&gt;
	&lt;li&gt;Are all parts of the equipment readily accessible for inspection, maintenance, sanitation?&lt;/li&gt;
	&lt;li&gt;Is there any evidence of premature wear on parts?&lt;/li&gt;
	&lt;li&gt;Does the equipment properly self-drain to assure food product, water or sanitizing fluids do not accumulate?&lt;/li&gt;
	&lt;li&gt;Are all hollow areas removed where possible or permanently sealed to eliminate any harborage areas?&lt;/li&gt;
	&lt;li&gt;During operation, does the equipment perform properly as not to contribute to unsanitary conditions?&lt;/li&gt;
	&lt;li&gt;Is the equipment free of niches, pits, cracks, corrosion, recessed, open seams, gaps inside threads, bolt rivets, protruding ledges, rusting and dead ends?&lt;/li&gt;
	&lt;li&gt;Are the enclosures and HMIs designed, constructed, and maintained to ensure food product, water or other liquids do not penetrate or accumulate on the enclosure or interface?&lt;/li&gt;
	&lt;li&gt;Is there adequate space between the floor and the equipment body for sanitation?&lt;/li&gt;
	&lt;li&gt;Are bearings, gear motors and hydraulic system sealed, guarded, and/or mounted away from the product zone? &lt;br /&gt;
	&lt;br /&gt;
	Our 25-point checklist walks through compatibility, compliance, &lt;a href="https://www.mepaco.net/news/blog/interactive-pdf-highlights-food-safety-compliance-and-processes" target="_blank"&gt;food safety&lt;/a&gt; risk and personnel safety.  &lt;br /&gt;
	&lt;br /&gt;
	&lt;a href="https://www.mepaco.net/contact/sales"&gt;&lt;strong&gt;Contact a technical sales manager for a plant visit risk review.&lt;/strong&gt;&lt;/a&gt;&lt;/li&gt;
&lt;/ul&gt;
</description><guid isPermaLink="false">1092</guid></item></channel></rss>